TITLE: 04/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.17 μm/s
QUICK SUMMARY:
GV7 was closed last night (~530pm)--still only soft closed to the X-arm (Y-arm has been [hard] closed ~2weeks).
Closeout work in HAM1 will need to continue today and then move tables away from HAM1 in prep for a Monday vent.