TITLE: 04/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Final HAM1 checks were made by Keita & Sheila in the morning. ISCT1 was pulled away from HAM1.
There is new anti-slip (yellow) paint on part of the ramp at the OSB door enttrance ramp near the Control Room. This paint should be dry, so it some signs have been removed. (Waiting on more paint to finish job.)
LOG:
- 1445 optics lab technical cleaning (kim)
- 1448 X-arm tumbleweed check (randy)
- 1510-1657 alum-A-lift moved from staging to hi-bay to West Buy (randy)
- 1541 technical cleaning lvea (kim)
- 1545-1555 checking mega cleanroom (sheila)
- 1603 -1828 Opening HAM1 covers + light pipe + moving ISCT1 out of the way (keita.sheila.randy)
- They had to put back up the laser safety barriers for ther South Bay & reconnect isct1
- 1738: Light pipes closed, HAM1 covers closed, taking down laser barriers.
- 1758: Sheila moving over to SQZT7 & going to local laser hazard
- 1825 SQZT7 work is done & Sheila is out of the LVEA. Laser is still ON, so Sheila can continue SQZ work from Control Room. Sheila will turn this laser off at the end of the day--Will want to turn this laser OFF before venting so we can return to full Laser Safe (Operations Laser Safe?).
- 1801-1828: Moving ISCT1 away from HAM1 (first have to crane a door out of the way and then they can forklift) [randy, keita]
- 1625-1739 Taking photos of BSC3 for Neil (carlos)
- 1632-1749 Recon of racks: susR2@ham3, seiC2@cer (jeff)
- 1634 Anti-Slip coating appliction to OSB door entry near Control Room (tyler)
- Able to paint the sides, but need more coating material for the center portion. This material takes ~4hrs to cure.
- 2001-2115 Survey work on back-side of the Y-arm (bubba)
- 2030-2046 Checking susR1 rack check near HAM2 (jeff)
- 2052-2057 returned to rack (jeff)
- 2204-2208 back to susR2
- 2224 -2233 H2 Bldg walkabout (Josh F)
I followed the transition checklist to upgrade phase laser safe to make sure everything is set for venting on Monday. The only thing that I had to change was turning off the squeezer laser, as expected.