corey.gray@LIGO.ORG - posted 16:28, Friday 03 April 2026 - last comment - 16:43, Friday 03 April 2026(89764)
Fri Ops DAY Shift Summary

TITLE: 04/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Final HAM1 checks were made by Keita & Sheila in the morning.  ISCT1 was pulled away from HAM1.  

There is new anti-slip (yellow) paint on part of the ramp at the OSB door enttrance ramp near the Control Room.  This paint should be dry, so it some signs have been removed.  (Waiting on more paint to finish job.)
LOG:

Comments related to this report
sheila.dwyer@LIGO.ORG - 16:43, Friday 03 April 2026 (89779)

I followed the transition checklist to upgrade phase laser safe to make sure everything is set for venting on Monday.  The only thing that I had to change was turning off the squeezer laser, as expected.  