TITLE: 04/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM1 +y door removed (installed, thanks Betsy!) in the morning and Corner venting has begun (continues tomorrow). h1seih7 was fixed and there was a daq restart for all the model changes from yesterday/today. With the CDS work, guardian reboots, and other work which took SEI/SUS to non-standard states, everything looks mostly green on the OPS OVERVIEW for SUS & SEI.
LOG:
- 1339-1640 Technical cleaning in lvea (nellie)
- 1506-1530 out for a break & back out at 1530
- 1440-1515 HAM3 clean-up (randy)
- 1530 PCal Lab and then EY for meas (tony.dripta)
- 1627 ETMy ALIGNED (from MISALIGNED)
- 1550-1638 FCES Air Handler maintenance (eric)
- 1554 Install HAM1 +y door (travis,jordan,randy)
- 1608 HAM2 (+HAM1, obviously) ISI tripped, so I took to DAMPED during door work.
- 1629 Running a clamp out to HAM1 team (ibrahim)
- 1602 new timing card for h1sei7 (erik,patrick,dave, marc)
- 1645 BSC2 & HAM6 in-rack work (fil)
- 1703-1732 Checking BSC2 stop screws for HEPI (jim)
- 1740-1752may return w/ ruler
- 1710-1736 Working on new dustmonitor in DiodeRoom (ryanC)
- 1712 Checking on fil in the CER (richard)
- 1739 Status Clean-up (betsy request):
- ALIGNED PRM, SRM, MC2, PR2, (just to have a good baseline)
- Waiting on HAM1 doors and then will return HAM1 & HAM2 to
- 1745 CHeTA Lab work, local laser hazard (camilla,madi,sophie)
1830-1920: I stepped away to give a tour for kids on spring break and staff members of the Yakama Nation (Many thanks to RyanC for covering the chair in my stead).
- .2000 BSC2 & HAM6 in-rack work continued (fil)
- 2027 PCal Lab work (tony)
- 2028 Rebooting h1guardian1 for quarterly maintenance (tj)
- ~2122 Jennie noticed on OPS OVERVIEW that we had 2W for JAC INPUT POWER. This also probably restored 2W for input power. Jennie took it to 0W
- 2045-2245 Vent prep & venting (travis, jordan)
- 2123 Jordan brought in the checklist to address HIGH VOLTAGE items to address before venting:
- Can't remember the verbiage, but there was mention of confirming "HEPI is safe". Not clear what this meant, so I phoned Jim and he said take SEI Guardians to ISI_DAMPED_HEPI_OFFLINE. This was done for all Corner station SEIs.
- For High Voltage, Jordan had this checklist document: M1300464 (HEPIs are not listed in this document, btw):
- Picomotors: most of these were already disabled.
- There were some which were enabled (1. SQZT0 and 2. HAM7 + SQZT7 ), these were disabled.
- Ring Heaters---VAC team takes care of these on the floor.
- SQZ OPO Tec: SQZ OVERVIEW / TECs (blue button) / OPO from drop down ---> Servo already disabled.
- Document (M1300464) mentioned this which was a little confusing: go to the SQZ Overview & open the OPO dropdown (it's actually the TEC dropdown).
- HAM1's already vented, but after Jordan chatted with Fil, decided to kill the PZT at HAM1 (for JAC?)
- ~2120-2150 ISCT1 was rolled back near HAM1---to clear up space for a garb room (ibrahim, randy)
- 2135 viewport inspection in optics lab(camilla, madi)....then off to CHeTA with Sophie...
- 2233 CHeTA lab work, local laser hazard (sophie, camilla, madi)