TITLE: 04/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 2mph Gusts, 0mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.17 μm/s
QUICK SUMMARY:
Some Workstations were rolled back to Debian 12 last night this will likely continue today.
HAM1 is closed.
GV 2 and GV5 are both closed.
Looks the VAC team is Venting BSC2's volume to prep for the up coming work.