Reports until 07:34, Friday 10 April 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:34, Friday 10 April 2026 (89852)
OPS Day Shift Start

TITLE: 04/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.14 μm/s 
QUICK SUMMARY:

IFO is in IDLE for MAINTENANCE

BSC2 and HAM3 prep and vacuum work to continue