Displaying report 1-1 of 1.
Reports until 16:30, Friday 10 April 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:30, Friday 10 April 2026 (89862)
OPS Day Shift Summary

TITLE: 04/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for PLANNED MAINTENANCE

Main tasks today:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:36 FAC Kim, Nellie LVEA N Technical cleaning 15:21
14:56 FAC Randy MY, LVEA N Picking up lift 16:41
15:04 IAS Jason LVEA N Turning on FARO 15:17
15:49 FAC Kim, Nellie LVEA N Technical cleaning 16:25
16:08 OPS TJ LVEA N Helping Jim with HAM3 Platforms, looking around 16:58
16:14 SEI Jim LVEA N HAM3 Platforms 16:31
16:28 EE Marc CER N PSL Chassis Work 16:58
17:13   Camilla, Gerardo Optics Lab N Inspecting optics 18:32
17:14 IAS Ryan C, Jason LVEA N FARO 19:40
17:17 FAC Kim LVEA N Technical Cleaning 17:46
18:33 VAC Travis, Gerardo LVEA N Checking out FC Tube 19:37
20:06 FAC Randy LVEA N BSC1 Doors 22:06
20:14 SUS TJ, Elenna Optics Lab N Manta Ray Cabling (BHSS) 21:08
20:31 IAS Jason, Ryan C LVEA N FARO 22:31
20:34 VAC Gerardo, Travis LVEA N Biergarten work 22:45
20:43 EE Marc, Erik CER N Chassis work 21:08
21:09 TCS Madi, TJ EY Local Hartmann 22:45
22:48 CDS Dave EY N Labeling 23:20
23:01 PEM Robert EX N Grounding studies 00:01

 

Displaying report 1-1 of 1.