TITLE: 04/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 22mph Gusts, 17mph 3min avg
Primary useism: 0.07 μm/s
Secondary useism: 0.16 μm/s
QUICK SUMMARY:
SUS JM3 is still saturating
SUS BS is also seeing some saturation
BSC2 Dome Not removed yet.
What work are we thinking will happen today?:
Faroing Inside the vacuum chamber shooting through HAM3 to BSC2.
Vac parts removed from BSC2 dome.