Reports until 08:27, Monday 13 April 2026
H1 General
anthony.sanchez@LIGO.ORG - posted 08:27, Monday 13 April 2026 (89870)
Ops Monday Morning report

TITLE: 04/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 22mph Gusts, 17mph 3min avg
    Primary useism: 0.07 μm/s
    Secondary useism: 0.16 μm/s 
QUICK SUMMARY:
SUS JM3 is still saturating 
SUS BS is also seeing some saturation
BSC2 Dome Not removed yet. 
What work are we thinking will happen today?: 
Faroing Inside the vacuum chamber shooting through HAM3 to BSC2.  
Vac parts removed from BSC2 dome.