TITLE: 04/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in IDLE for MAINTENANCE
Very productive day in which BSC2 FARO work continued (and is ongoing but almost done). Cleanroom was moved to the biergarten. Prep for dome removal finalized. CEBEX was on-site at MY.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:55 | FAC | bubba, C&E | MY | N | Trenching? | 01:55 |
| 14:55 | FAC | Kim, Nellie | LVEA | N | Technical Cleaning | 15:37 |
| 15:14 | FAC | Chris + Pest-guys | LVEA, Tubes | N | Debugging | 19:14 |
| 15:15 | IAS | Ryan C | LVEA | N | Warming FARO | 15:23 |
| 15:29 | FAC | Randy, TJ | LVEA | N | Garb room location inspection | 15:43 |
| 15:36 | Camilla | Optics Lab | N | Inspecting optics | 19:23 | |
| 15:37 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 16:22 |
| 15:44 | FAC | Randy | LVEA | N | Moving stuff around | 16:21 |
| 16:04 | CC | TJ, Jordan | LVEA | N | Check out garbing situ | 16:11 |
| 16:12 | VAC | Jordan | LVEA | N' | Vacuum inventory | 16:14 |
| 16:16 | EE | Fil, Corey | LVEA, FCES' | N | West Bay cameras | 19:04 |
| 16:17 | IAS | Jason, Ryan C | LVEA | N | FARO BSC2 | 00:07 |
| 16:21 | SEI | Jim | LVEA | N | Locking ITM Baffles | 18:37 |
| 16:34 | VAc | Jordan | LVEA | N | cp1 staging parts | 20:49 |
| 16:43 | ICS | Jeff | Optics Lab | N | Searching for part | 17:30 |
| 16:44 | FAC | Randy | LVEA | N | Craning clean room | 17:40 |
| 16:44 | FAC | TJ | LVEA | N | Craning clean room | 17:40 |
| 16:50 | VAC | Gerardo | LVEA | N | Cleanroom move | 17:29 |
| 17:02 | VAC | Travis | LVEA | N | Checking on Gerardo and Jordan | 20:01 |
| 17:21 | Marc | Marc | EX | N | Swapping power supply | 19:02 |
| 17:42 | FAC | Randy | EX, EY | N | Looking for a spreader bar | 19:47 |
| 18:03 | FAC | Kim | LVEA | N | Technical Cleaning | 19:02 |
| 19:13 | epo | jennie.disha.guest | lvea | n | lvea tour | 19:47 |
| 19:15 | pem | robert | EX | - | grounding studies | 00:03 |
| 19:36 | fac | randy.tyler | EY | - | grabbing bsc spreader bar | 20:37 |
| 20:34 | ee | fil | MER | - | pull sus cables | 23:34 |
| 20:50 | sei | jim | bsc2 | - | stickman duties for FARO | 23:36 |
| 20:56 | OPS | TJ | LVEA | N | Battery delivery | 21:01 |