Reports until 16:46, Tuesday 14 April 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:46, Tuesday 14 April 2026 (89894)
OPS Day Shift Summary

TITLE: 04/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for MAINTENANCE

Very productive day in which BSC2 FARO work continued (and is ongoing but almost done). Cleanroom was moved to the biergarten. Prep for dome removal finalized. CEBEX was on-site at MY.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:55 FAC bubba, C&E MY N Trenching? 01:55
14:55 FAC Kim, Nellie LVEA N Technical Cleaning 15:37
15:14 FAC Chris + Pest-guys LVEA, Tubes N Debugging 19:14
15:15 IAS Ryan C LVEA N Warming FARO 15:23
15:29 FAC Randy, TJ LVEA N Garb room location inspection 15:43
15:36   Camilla Optics Lab N Inspecting optics 19:23
15:37 FAC Kim, Nellie LVEA N Technical cleaning 16:22
15:44 FAC Randy LVEA N Moving stuff around 16:21
16:04 CC TJ, Jordan LVEA N Check out garbing situ 16:11
16:12 VAC Jordan LVEA N' Vacuum inventory 16:14
16:16 EE Fil, Corey LVEA, FCES' N West Bay cameras 19:04
16:17 IAS Jason, Ryan C LVEA N FARO BSC2 00:07
16:21 SEI Jim LVEA N Locking ITM Baffles 18:37
16:34 VAc Jordan LVEA N cp1 staging parts 20:49
16:43 ICS Jeff Optics Lab N Searching for part 17:30
16:44 FAC Randy LVEA N Craning clean room 17:40
16:44 FAC TJ LVEA N Craning clean room 17:40
16:50 VAC Gerardo LVEA N Cleanroom move 17:29
17:02 VAC Travis LVEA N Checking on Gerardo and Jordan 20:01
17:21 Marc Marc EX N Swapping power supply 19:02
17:42 FAC Randy EX, EY N Looking for a spreader bar 19:47
18:03 FAC Kim LVEA N Technical Cleaning 19:02
19:13 epo jennie.disha.guest lvea n lvea tour 19:47
19:15 pem robert EX - grounding studies 00:03
19:36 fac randy.tyler EY - grabbing bsc spreader bar 20:37
20:34 ee fil MER - pull sus cables 23:34
20:50 sei jim bsc2 - stickman duties for FARO 23:36
20:56 OPS TJ LVEA N Battery delivery 21:01