LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 08:02, Wednesday 15 April 2026 (89896)
OPS Day Shift Start

TITLE: 04/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 14mph Gusts, 8mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.25 μm/s 
QUICK SUMMARY:

IFO is in IDLE for MAINTENANCE

Today the main task is to remove the BSC Dome and continued FARO work.