Attahed and in the table below are oplev positions for ITMY, ITMX and BS since last DRMI lock on 03/19/2026 at 11:02 PDT
| DRMI Locked Reference | Latest | |
| 11:02 PDT 03/19/26 | 15:00 PDT 04/14/26 | |
| BS P Oplev | 2.10 | 0 |
| BS Y Oplev | -25.92 | 0 |
| BS Sum Oplev | 20215.30 | 19605.8 |
| IX P Oplev | -10.70 | -3.64 |
| IX Y Oplev | 5.10 | -1.2 |
| IX Sum Oplev | 3188.52 | 4.7 |
| IY P Oplev | -26.65 | 42.5 |
| IY Y Oplev | -3.22 | 22.92 |
| IY Sum Oplev | 7904.27 | 4731.59 |
Note 1: The BS Oplev Damping loops were still on during some FARO work and were shaking the BS. We turned these off on morning of April 14.
Note 2: The right-most T-cursor marks the corner-station vent
Note that gate valve closure means that IX oplevs would read a 0 sum. This is expected.
Also, since this alog, Jeff/Ibrahim flipped the BS OPLEV Damping Servo OFF via the damping filter bank buttons, and re-turned-on the output buttons of the main banks, so those Pit/Yaw channel values bounced back up from 0 to more reasonable values.