TITLE: 04/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in IDLE and MAINTENANCE
Did not end up taking the dome off but went in for more measurements/FARO of the beamsplitter. Most of the setup from dome removal is done and dome removal is slated for tomorrow.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:35 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 15:53 |
| 15:08 | IAS | Ryan C | LVEA | N | FARO Startup | 15:12 |
| 16:01 | FAC | Tricities Asphalt | MY | N | Asphalt-ing | 20:01 |
| 16:17 | SUS | Randy | LVEA | N | Handrail BSC and craning | 17:03 |
| 16:20 | FAC | Kim | EX, MX | N | Technical Cleaning | 18:02 |
| 16:36 | IAS | Ryan C, Jason | LVEA | N | FARO | 18:10 |
| 16:37 | PEM | Robert | EX | n | Grounding himself | 20:26 |
| 16:50 | EE | Fil | MER | N | Rack Cabling | 18:01 |
| 17:02 | TCS | Camilla, Madi | Optics Lab | N | Grabbing parts | 17:46 |
| 17:13 | TCS | TJ | EX | Y | HWS Work | 19:14 |
| 17:13 | SUS | Jim | LVEA | N | FARO Support | 18:01 |
| 17:35 | VAC | Travis | LVEA | N | Turbopumps out at 1900 | 19:19 |
| 17:46 | TCS | Camilla, Madi | EX | Y | HWS work | 19:14 |
| 18:01 | VAC | Jordan, Gerardo | LVEA | N | North Bay Craning | 18:57 |
| 18:01 | EE | Fil | LVEA | N | Cabling | 19:39 |
| 18:10 | OPS | Corey | Optics Lab | N | Part search | 18:25 |
| 18:28 | FAC | Randy | LVEA | N | Craning out at 1900 | 19:19 |
| 18:28 | SEI | Jim | LVEA | N | Poking HAM4 HEPI | 18:32 |
| 18:44 | OPS | Oli | LVEA | N | Look at West bay camera placement | 18:57 |
| 19:39 | EE | Fil | MER | N | Cabling | 22:38 |
| 19:53 | SUS | RyanC | CR | N | ETM OPLEV charge measurements | 22:03 |
| 20:35 | VAC | Travis, Gerardo, Jordan | LVEA | N | GV5 work | 21:42 |
| 20:39 | SUS | Betsy, Jason, Ryan C | LVEA | N | Scale measurements | 22:39 |
| 20:47 | TCS | Madi, Camilla | LVEA | N | Bugging Travis | 23:33 |
| 20:51 | SUS | Corey | LVEA | N | Photo Op | 22:06 |
| 21:00 | TCS | Camilla, Madi | Optics Lab | N | Turning on eyesafe green laser | 22:00 |
| 21:09 | FAC | Randy | LVEA | N | Joining Corey | 21:25 |
| 21:10 | SEI | Jim | BSC2 | N | BSC2 HEPI Work | 23:10 |
| 21:50 | OPS | Oli | LVEA, Optics Lab | N | Ruler transport | 22:06 |
| 23:34 | TCS | Madi, Camilla | Optics Lab | Testing eye safe laser | 00:04 |