LHO General
ryan.short@LIGO.ORG - posted 07:40, Thursday 16 April 2026 (89912)
Ops Day Shift Start

TITLE: 04/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 20mph Gusts, 13mph 3min avg
    Primary useism: 1.01 μm/s
    Secondary useism: 0.27 μm/s 
QUICK SUMMARY: More work in BSC2 planned for today to prepare for dome and cartridge removal. A M6.0 earthquake from New Zealand is passing through.