LHO General
ryan.short@LIGO.ORG - posted 16:35, Thursday 16 April 2026 (89927)
Ops Day Shift Summary

TITLE: 04/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The BSC2 dome is off as of this morning! Work is now ongoing on the ISI to prep for cartridge removal, which is currently scheduled for late next week. The TCS X chiller tripped off with a "high pressure warning" at 22:56; Camilla is investigating.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:39 FAC Kim, Nellie LVEA N Technical cleaning 15:36
15:18 FAC Randy LVEA N Checking cleanroom in East bay 16:31
15:38 CDS Tony LVEA N Laptop inventory 17:55
16:03 FAC Kim, Nellie LVEA N Technical cleaning 16:52
16:15 PEM Robert EX N Grounding 19:09
16:28 CDS Fil LVEA N Repositioning BSC2 camera 17:18
16:34 VAC Jordan, Gerardo, Travis, Randy LVEA N BSC2 dome removal 19:08
16:45 TCS Camilla LVEA/OptLab N Property inventory 17:18
16:45 SEI Jim, Mitchell LVEA N Prep for BSC2 dome removal 16:47
16:52 SEI Jim, Mitchell EX N Looking for HEPI parts 17:50
16:54 AOS Betsy LVEA N Parts staging for dome removal 18:15
17:04 EPO Corey LVEA N Dome removal documentation 19:08
17:23 FAC Kim LVEA N Stocking wipes 17:59
17:29 AOS Mike, Jenne, Amber +1 LVEA N Tour 17:42
17:56 CDS Tony EX, EY N Laptop inventory 18:39
18:18 FAC Mitchell LVEA LVEA BSC2 dome removal 19:01
18:18 SAF Jenne LVEA N Hardhat sign checks 18:29
18:27 EE Marc MEZ N Move over a power supply 18:52
18:35 FAC Tyler LVEA N BSC2 dome removal 18:40
19:51 FAC Randy LVEA N Putting away parts 20:08
20:08 SEI Jim, Mitchell LVEA N BSC2 HEPI 23:32
20:21 SUS Fil MER N Rack wiring 22:18
20:28 ISC Elenna, Oli OptLab N PZT cabling checks 21:37
20:30 CDS Marc EX, EY N Staging power supplies 21:37
21:01 FAC Randy, Tyler LVEA N Cleanroom work near HAM6 21:15
21:29 VAC Jordan LVEA N Prep for CP1 regen 23:06
22:01 VAC Travis LVEA N Check HAM1/2 AIP 22:11
22:11 VAC Travis MY N Collecting parts 23:00
22:19 PEM Robert EX N Grounding Ongoing
22:19 TCS Camilla, Madi EX YES ALS/HWS table work 23:06
22:50 TCS Ibrahim MER N TCS chillers check 23:06
23:32 TCS Camilla LVEA/MER N Checking chiller lines Ongoing