Reports until 16:29, Tuesday 17 December 2013
H1 SUS
betsy.weaver@LIGO.ORG - posted 16:29, Tuesday 17 December 2013 (8993)
SR2 testing cables rerouted

Today, Travis and rerouted the SUS testing cables from the SRM satellite boxes to the SR2 satellite boxes and cleaned up all the riff raff cabling left over from OMC work in the area.  We labeled the cables and the SR2 sat boxes.  Note, currently SRM is still plugged into the table end of the cables so we need to just move them the the SR2 suspension on the table.  I also moved the SR2 optic (in a special holder) to the table so be aware.

 

Next up:  Level and suspend the SR2 all metal sus and pull back all of the OSEMs in order to take open light gain/offsets.