Displaying report 1-1 of 1.
Reports until 07:37, Friday 17 April 2026
H1 General
oli.patane@LIGO.ORG - posted 07:37, Friday 17 April 2026 (89934)
Ops DAY Shift Start

TITLE: 04/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 1mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY: BSC2 ISI work today

Displaying report 1-1 of 1.