Displaying report 1-1 of 1.
Reports until 16:58, Friday 17 April 2026
H1 General
oli.patane@LIGO.ORG - posted 16:58, Friday 17 April 2026 (89941)
Ops DAY Shift End

TITLE: 04/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: No further work was done regarding BSC2
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:51 FAC Nellie, Kim LVEA n Tech clean, Nellie out 15:51 15:55
15:51 FAC Nellie EY n Tech clean 16:35
16:37 PEM Robert EX n Grounding 00:25
17:13 PCAL Tony, Erik EX, EY n Trying to get PCAL laser back up 17:57
18:29 PCAL Tony PCAL Lab y(local) Fixing broken chassis 19:09
18:33 EPO Jeff, friend LVEA n Tour of LVEA 19:35
18:38 VAC Jordan LVEA n Turning HAM1 AUX carts off 18:42
20:07 EPO Jeff, friend LVEA n Tour 21:26
22:02 VAC Jordan, Mitchell LVEA n Decoupling AUX carts 22:25
22:40 VAC Jordan LVEA n Turning on RGA for CP1 22:54
Displaying report 1-1 of 1.