H1 General
oli.patane@LIGO.ORG - posted 16:33, Monday 20 April 2026 (89953)
Ops DAY Shift End

TITLE: 04/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Some BSC2 and cabling work done today. HAM5 and HAM6 HEPI are going to be down overnight since the HEPI pump is having issues.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:40 FAC Kim, Nellie LVEA n Tech clean 15:32
15:09 FAC Randy MidY n Rock cleanup on aisle MY 16:10
15:51 FAC Nellie HAM Shack n Tech clean 16:34
16:01 VAC Jordan LVEA n CP1 RGA work 16:29
16:44 SEI Jim LVEA n BSC2 work 17:49
16:57 IAS Jason LVEA n FARO scoping 17:28
17:20 FAC Randy LVEA n Just looking at HAM6 cleanroom 18:07
17:21 VAC Jordan, Gerardo, Travis LVEA n CP1 pump work 18:44
17:34 SEI Mitchell LVEA n BSC2 work 17:49
19:10 EPO Jeff, +1 LVEA n Tour 20:17
19:47 EE Fil MER n HAM6 cabling 00:20
20:18 VAC Travis, Jordan, Gerardo LVEA n CP1 pump work 23:29
20:23 CDS Dave EX n Reboot BRSX 21:30
20:25 FAC Randy LVEA n Looking at HAM6 some more 21:43
20:29   Jennie Optics Lab n Looking for laptop 20:40
20:37   Betsy LVEA n Looking at HAM6 with Randy 21:46
20:44 IAS Jason LVEA n Grabbing FARO parts 20:57
21:10 SEI Jim LVEA n Talking with Betsy / SEI work 23:28
21:19 TCS Madi, Camilla, Maya OpticsLab, LVEA n Grabbing parts 21:51
21:30 CDS Dave EY n Verifying 24V power supply 22:02
21:44 SEI Mitchell LVEA n BSC2 work 23:28
21:52 TCS Camilla, Madi, Maya EX y(local) HWS work 23:06
22:12 IAS Jason, RyanC LVEA n Setting up FARO for tomorrow 22:40
22:22 TCS TJ LVEA n Draining TCS chiller line 23:19
23:15 SUS Ibrahim LVEA n BBSS ExpreSS 23:33