Ops Afternoon Shift Summary

TITLE: 04/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Busy day after taking over from Corey. End-of-day optic alignment trends are attached; only things of note are that MC2 is now MISaligned after the Guardian restart today.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:38 CAL Tony, Marc PCal Lab - Looking for parts 17:52
17:38 TCS TJ LVEA - TCSX expansion joint 18:05
18:10 IAS Ryan C LVEA - FARO in West bay 19:11
18:20 IAS Jason LVEA - FARO in West bay 19:11
18:28 CAL Tony, Fil, Marc EY - PCal chassis troubleshooting 18:51
18:35 FAC Randy LVEA - Pictures in mega cleanroom 18:43
19:26 FAC Randy LVEA - Prep for BSC2 platform craning 19:47
19:29 PEM Ryan C CER - Testing dust monitor 19:39
19:52 EE Fil, Marc EY - PCal chassis/interlock work 23:11
20:03 SEI Jim, Randy LVEA - Craning BSC2 walking plates 21:30
20:05 PEM Ryan C CER - Swapping dust monitors 20:12
20:41 IAS Jason, Ryan C LVEA - FARO in West bay 22:41
20:43 TCS TJ LVEA - Prep for TCSX table line swaps 20:58
20:58 CDS Dave EY - Chassis power supply swap 22:08
21:04 VAC Travis, Jordan LVEA - Craning BSC2 walking plates 21:23
21:21 CDS Erik CR - Powering off h1iopiscey 21:21
21:59 TCS TJ LVEA - TCSX table water line replacements 23:44
22:09 SEI Jim, Mitch LVEA - BSC2 HEPI actuators 23:26
22:14 TCS Camilla LVEA - TCSX table water line replacements 23:51
22:35 CDS Dave EX - Checking power supplies 23:08
22:51 IAS Jason, Ryan C FCES - Grabbing equipment 23:24
23:11 EE Fil, Marc LVEA/OptLab - Inventory 00:11
23:32 PEM Ryan C CER - Dropping off dust monitors 23:33
23:34 VAC Jordan LVEA - Pictures of CP1 23:40
23:42 CAL Tony EY - Bringing PCal back up 01:42