Displaying report 1-1 of 1.
Reports until 16:30, Wednesday 22 April 2026
LHO General
ryan.short@LIGO.ORG - posted 16:30, Wednesday 22 April 2026 (89979)
Ops Day Shift Summary

TITLE: 04/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More progress towards preparing to remove the BSC2 cartridge, both in-chamber and out, which is now slated to happen on Monday.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:39 FAC Kim, Nellie LVEA - Technical cleaning 16:00
14:39 FAC Randy LVEA - Craning walk platforms at E-mod 15:36
15:29 SUS Betsy LVEA - Staging for BSC2 16:26
15:46 SUS Ibrahim LVEA - Staging for BSC2 16:26
15:48 EE Fil LVEA - De-cabling IOT2L 16:51
16:00 FAC Nellie EY - Technical cleaning 16:47
16:07 TCS Camilla, TJ LVEA - CO2X table water pipe swap 16:58
16:08 FAC Kim MX - Technical cleaning 16:45
16:52 EE Fil MER - HAM6 SUS cabling 19:37
17:09 AOS Jennie, Tony LVEA - Scouting IOT1 table position 17:15
17:12 EE Marc LVEA - Grabbing a chassis 17:20
17:25 SUS Ibrahim, Betsy, Oli LVEA - Inspecting BS and OpLev in-chamber 18:57
18:14 TCS TJ, Camilla LVEA - CO2X table water pipe swap 19:44
18:26 CAL Tony EY - Checking PCal interlock 18:50
18:31 SUS Mitchell LVEA - Dropping off parts 18:52
18:33 FAC Randy LVEA - Walkabout 18:57
19:50 FAC Randy, Mitch, Travis LVEA - Installing BSC2 walk platforms (Travis out @ 20:47, Mitch out @ 21:38) 21:50
20:04 FAC Tyler EX - Checking chiller 20:51
20:33 AOS Betsy LVEA - Staging for BSC2 21:12
20:50 AOS Ibrahim LVEA - Staging for BSC2 21:50
21:13 ISC Camilla, Tony LVEA - Rolling up IOT1 21:46
21:22 SUS Jason LVEA - Checking BS OpLev pointing 22:11
21:32 SUS Betsy LVEA - Checking BS OpLev pointing, other checks 22:29
21:41 ISC Jennie, Madi LVEA - Rolling up IOT1 21:46
22:59 EE Marc LVEA - Installing chassis 23:30
Images attached to this report
Displaying report 1-1 of 1.