Ibrahim, Jim, Mitchell
Mitchell and I removed the BS stays from the beamsplitter and placed them in the tube between BSC2 and HAM4. Then, Mitchell and I put the cover over the BS.
Jim and Mitchell were working on removing and bundling SEI cables from inside BSC2 for storage by ISI. Jim (on ISI) and I (in BSC2) then removed cable clamps from the bottom of the ISI/ceiling of BSC2.
Picture provided.