H1 General
anthony.sanchez@LIGO.ORG - posted 16:39, Friday 24 April 2026 (90010)
Friday Ops shift report.

TITLE: 04/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

CDS Frame Write restarts @ 15:21 UTC

Lots BSC2 work was done today.
Beam splitter Stays were removed and in between BSC2 and HAM4. Pictures of the Beam Splitter cover and more details can be found here: alog link. 
The Beam splitter cartridge is closer than ever to fly out of the BSC2 Chamber. 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:56 FAC Kim & Nellie LVEA N Technical Cleaning & resupply Nellie out first 15:49
15:45 CDS Jonathan Remote N FW restarts. 15:50
16:11 FAC TJ, Randy LVEA N Moving IOT2 table. 16:35
16:24 IAS Jason & Ryan C LVEA West bay N Faro surveying. 19:24
16:33 EE Marc LVEA N Pulling sat amps 17:13
16:39 FAC Randy LVEA N Working on MEGA CleanRoom 21:32
16:53 SEI Jim CER N Checking AA chassis for inputs 17:08
19:24 SUS Ibriham & Betsy LVEA BSC2 N Putting a sheild around the BS. 20:45
19:31 SPI Jeff Optics lab N Dropping part off 19:31
20:21 SEI Jim LVEA BSC2 N Helping prep for flying a Beam splitter 22:42
20:33 SUS Mitch LVEA N Helping Jim/Betsy 21:32
20:43 IAS Jason & Ryan C LVEA West bay N Faro surveying 22:44
21:32 SUS Ibrahim LVEA BSC2 N Takeing BS stays 22:42
21:58 BHSS Keita & Disha & Elenna Optics lab yes? Working on Manta Ray 22:44