TITLE: 04/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
CDS Frame Write restarts @ 15:21 UTC
Lots BSC2 work was done today.
Beam splitter Stays were removed and in between BSC2 and HAM4. Pictures of the Beam Splitter cover and more details can be found here: alog link.
The Beam splitter cartridge is closer than ever to fly out of the BSC2 Chamber.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:56 | FAC | Kim & Nellie | LVEA | N | Technical Cleaning & resupply Nellie out first | 15:49 |
| 15:45 | CDS | Jonathan | Remote | N | FW restarts. | 15:50 |
| 16:11 | FAC | TJ, Randy | LVEA | N | Moving IOT2 table. | 16:35 |
| 16:24 | IAS | Jason & Ryan C | LVEA West bay | N | Faro surveying. | 19:24 |
| 16:33 | EE | Marc | LVEA | N | Pulling sat amps | 17:13 |
| 16:39 | FAC | Randy | LVEA | N | Working on MEGA CleanRoom | 21:32 |
| 16:53 | SEI | Jim | CER | N | Checking AA chassis for inputs | 17:08 |
| 19:24 | SUS | Ibriham & Betsy | LVEA BSC2 | N | Putting a sheild around the BS. | 20:45 |
| 19:31 | SPI | Jeff | Optics lab | N | Dropping part off | 19:31 |
| 20:21 | SEI | Jim | LVEA BSC2 | N | Helping prep for flying a Beam splitter | 22:42 |
| 20:33 | SUS | Mitch | LVEA | N | Helping Jim/Betsy | 21:32 |
| 20:43 | IAS | Jason & Ryan C | LVEA West bay | N | Faro surveying | 22:44 |
| 21:32 | SUS | Ibrahim | LVEA BSC2 | N | Takeing BS stays | 22:42 |
| 21:58 | BHSS | Keita & Disha & Elenna | Optics lab | yes? | Working on Manta Ray | 22:44 |