TITLE: 04/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 9mph Gusts, 5mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.16 μm/s
QUICK SUMMARY: The BSC2 (BS) cartridge is planned to be flown out of the chamber and onto the test stand in the LVEA West bay today!
We have some cell phone alarm bypasses in place this week.
EY Chiller supply temp is above nominal, a contractor will work on this during the week.
Fire pumps are running intermittently to supply water for construction. These are only bypassed during construction hours.
Bypass will expire:
Sat May 2 07:05:16 AM PDT 2026
For channel(s):
H0:FMC-EX_CY_H2O_SUP_DEGF
H0:FMC-CS_FIRE_PUMP_1
H0:FMC-CS_FIRE_PUMP_2