Reports until 16:33, Monday 27 April 2026
LHO General
ryan.short@LIGO.ORG - posted 16:33, Monday 27 April 2026 (90024)
Ops Day Shift Summary

TITLE: 04/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The BSC2 cartridge has been flown over to the test stand in the West bay.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:16 FAC Randy LVEA - Prep for cartridge removal 15:44
15:28 FAC Kim LVEA - Technical cleaning 16:38
15:30 AOS Tony LVEA - Connecting headset 16:13
16:51 FAC Kim LVEA - Technical cleaning 17:58
16:58 IAS Jason LVEA - Grabbing laptop 17:06
17:07 AOS Tony LVEA - BSC2 cartridge removal 20:36
17:07 SEI Jim LVEA - BSC2 cartridge removal 20:36
17:11 FAC Tyler LVEA - BSC2 cartridge removal 20:33
17:13 VAC Jordan LVEA - BSC2 cartridge removal 20:36
17:14 FAC Mitchell LVEA - BSC2 cartridge removal 20:36
17:17 TCS Camilla Opt Lab - Looking for a lens 17:32
17:24 AOS Betsy LVEA - BSC2 cartridge removal 20:36
17:24 VAC Gerardo LVEA - BSC2 cartridge removal 20:36
17:26 VAC Travis LVEA - BSC2 cartridge removal 20:01
17:32 TCS Camilla, Madi, Adrien EX YES ALS/HWS table work 18:39
17:34 EE Fil LVEA - Cabling HAM1 tables 19:07
17:38 AOS TJ LVEA - BSC2 cartridge removal 20:32
17:43 FAC Chris LVEA - FAMIS checks 18:29
17:57 SUS Tom Vac Prep - Cable making prep 18:32
18:03 SUS Rahul FCES - Looking for a table 18:29
20:11 ISC Keita, Elenna Opt Lab - BHD OMC work 21:43
20:18 SUS Oli, Tom Vac Prep - QOSEM cables Ongoing
20:43 EE Fil LVEA - Cabling HAM1 tables 22:18
21:08 PEM Ryan C LVEA - Setting up dust monitor at test stand 21:39
21:09 FAC Randy LVEA - Tidying up 21:18
21:46 TCS Camilla, Madi EX YES ALS/HWS table work Ongoing
22:05 ISC Elenna, Adrien Opt Lab - Tour 22:46
22:58 IAS Jason LVEA - Prepping FARO for tomorrow 23:06
23:04 SEI Jim LVEA - Checking dial indicators on BSC2 23:27
23:06 ISC Keita Opt Lab - BHD OMc work Ongoing
23:17 PEM Ryan C LVEA - Swapping dust monitor fuse Ongoing