TITLE: 04/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Test T634314 @ 16:00:30 UTC
Firepump1 is on 16:30:23
FirePump2 on 16:31:20 UTC
Eric confirms that Firepumps are done being used at 16:35 UTC
Vacuum Alarm for PT120B pressure torr started alarming @ 16:42 UTC, likely due to Fil pulling cables.
Dust monitors for LVEA 10 (Which I beleive is the dust mon in the BSC2 area.)
Test Frame Writer2 was restarted without incident.
HEPI Pump pressure diag main. Jim says he'd like this to become a Diag Main flag that gets raised when the following channels are more that 5% off from each other.:
H1:HPI-PUMP_L0_PS1_PRESS1
H1:HPI-PUMP_L0_PS2_PRESS1
H1:HPI-PUMP_L0_PS3_PRESS1
H1:HPI-PUMP_L0_PS4_PRESS1
MC2 and PR2 were taken to safe while betsy and Travis work in HAM3.
DC0 & FW restarts for new SPI front end models at 22:13 UTC.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:40 | FAC | Kim | LVEA | N | Technical Cleaning & Supplies. | 15:56 |
| 14:54 | FAC | Tyler & Betsy | LVEA | N | talking with Kim | 14:59 |
| 15:19 | SUS | Rahul | HAM3 | LVEA | Installing baffles. | 19:29 |
| 15:20 | FAC | Randy | LVEA | N | Helping Betsy | 15:39 |
| 15:31 | FAC | Chris | LVEA HAM7 | N | Checking traps. | 15:55 |
| 15:38 | SUS | Mitchell | LVEA HAM3 | N | Helping Rahul with Baffles | 19:25 |
| 15:41 | PEM | Ryan | LVEA | N | HAM3 Dust monitor | 15:48 |
| 15:42 | Safety | Richard & Gerardo | LVEA | N | Talking to Betsy, Gerardo still in. | 16:24 |
| 15:53 | FAC | Chris | MY,EY,MX,EX,FCES | N | Famis checks. | 16:42 |
| 16:04 | EE | Fil | LVEA | N | Pulling cables to the Test stand | 19:19 |
| 16:10 | Tour | Jeff & Adrian | LVEA | n | Touring the LVEA | 16:51 |
| 16:24 | Cheta | Camilla | Optics Lab | N | Checking for parts | 16:48 |
| 16:25 | VAC | Gerardo | LVEA | N | Moving the bang Blocks. | 17:38 |
| 16:26 | FAC | Randy | LVEA | N | Chatting with Betsy | 17:16 |
| 16:27 | FAC | Tyler | LVEA Highbay | N | Moving the MeatLocker. | 19:12 |
| 16:32 | FAC | Kim | LVEA | N | Techincal cleaning & Re-Suppling | 17:26 |
| 16:46 | VAC | Travis | LVEA | N | Checking on HAM3 Feed throughs. | 17:30 |
| 16:48 | VAC | Jordan | LVEA | N | Checking CP1 RGA tree | 17:18 |
| 17:30 | VAC | Travis | MX | N | Measurements on Cryopump | 17:54 |
| 18:08 | EPO | Cassidy & Youth Tour | Over pass | N | Leading a tour for the Youth. | 19:08 |
| 18:09 | Controls | Jeff, Tom, Oli | LVEA | n | Looking for Fil | 18:49 |
| 18:14 | Bets | Betsy | LVEA | N | Counting Cereal numbers. | 19:20 |
| 18:21 | SEI | Jim | LVEA IY | N | Reconnecting a cable that was accidentally disconnected. | 19:02 |
| 18:42 | EPO | Maggie | Over pass | N | Leading a Youth tour. | 19:27 |
| 18:52 | SPI | Jeff | LVEA HAM6 | n | 5 minute scavenger hunt for parts. | 18:54 |
| 19:01 | IAS | Jason & Ryan | LVEA | N | Faroing | 19:01 |
| 19:44 | SEI | Jim | Mech Mezz | N | Recovering the HEPI Pumps. | 20:15 |
| 20:09 | SEI | Jim | LVEA | N | Revalving BSC2 HEPI | 21:34 |
| 20:18 | IAS | Jason & Ryan C | LVEA | N | Faro Surveying | 23:48 |
| 20:22 | BHSS | Keita & Elenna | Optics Lab | n | working on Manta ray. | 22:09 |
| 20:23 | FAC | Randy | LVEA mega Cleanroom | N | adding unistrut! | 21:24 |
| 20:59 | VAC | Travis & Betsy | LVEA HAM3 | N | feedThrough work in HAM3 | 22:59 |
| 21:11 | EE | Marc | CER | N | Installing SUS chassis | 21:20 |
| 21:28 | IAS | Sheila & Adrian | LVEA | n | Faro Surveying | 22:30 |
| 23:06 | VAC | Gerado | LVEA West bay | N | Poking the "Super Sucker 500" | 23:26 |
| 23:21 | VAC | Jordan | LVEA WestBay | N | to help Gerardo with uh.... device mentioned | 23:26 |