ryan.short@LIGO.ORG - posted 16:32, Wednesday 29 April 2026 (90060)
Ops Day Shift Summary

TITLE: 04/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More surveying was done on the BS on the test stand, and electronics were connected to that the suspension can be damped.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:37 FAC Kim LVEA - Technical cleaning 17:54
14:37 FAC Randy LVEA - Work on HAM5/6/7 cleanroom 18:30
15:41 AOS Betsy LVEA - Walkabout 15:58
16:08 SUS Fil LVEA/CER - QOSEM susrack work 18:46
16:32 IAS Jason, Ryan C LVEA - BS FARO surveying 19:15
17:00 AOS Mitchell LVEA - Checking totes by HAM6 17:32
17:55 FAC Kim EX - Technical cleaning 19:15
18:25 SEI Jim LVEA - Replacing spring on BSC2 HEPI 19:10
18:29 AOS Mitchell LVEA - Bagging parts for LLO 18:51
18:40 ISC Elenna, Sheila Opt Lab - BHSS build 19:45
19:46 SEI Jim, Randy LVEA - Replacing spring on BSC2 HEPI 20:17
19:59 SUS Oli CER n Checking BS cabling 20:47
20:12 SUS Fil LVEA/CER - QOSEM susrack work 21:41
20:18 FAC Randy FCES - Forklifting a table to hi-bay 21:08
20:30 VAC Travis LVEA - Finishing HAM3 feedthru 21:41
20:42 IAS Jason, Ryan C LVEA - BS FARO surveying Ongoing
21:02 SUS Betsy LVEA - BS surveying 23:05
21:11 SUS Oli LVEA/CER - Check in w/ Fil 21:19
21:18 VAC Jordan LVEA - Staging parts by CP1 21:38
22:04 SUS Tom, Oli LVEA - QOSEM electronics 23:15
22:21 ISC Sheila LVEA/Opt Lab - Looking for laptops 22:33
22:24 AOS Mitchell LVEA -   22:35
22:40 ISC Camilla LVEA - ISCT1 bellows, putting away parts Ongoing
23:00 AOS Travis LVEA - Check in w/ Betsy 23:05
23:02 AOS Mitchell LVEA -   23:06
23:15 ISC Tony LVEA - ISCT1 bellows Ongoing