LHO General
ryan.short@LIGO.ORG - posted 16:30, Thursday 30 April 2026 (90080)
Ops Day Shift Summary

TITLE: 04/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Transfer functions were run on the BS, water lines on the TCSX table were replaced, a galled HEPI spring at BSC2 was removed, and a feedthru on HAM3 was swapped out.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:47 EE Fil LVEA - Running VAC cable 18:54
16:01 FAC Kim LVEA - Technical cleaning 17:11
16:17 TCS TJ, Camilla, Madi LVEA - CO2X water line work 18:18
17:11 IAS Ryan C LVEA - Grabbing a laptop 17:28
17:12 SUS Oli CR - BS transfer functions 18:59
17:16 ISC Elenna Opt Lab YES BHSS OMC work 18:18
17:40 FAC Kim LVEA - Technical cleaning 18:21
17:44 SEI Jim, Randy LVEA - BSC2 HEPI spring replacement 18:49
17:48 VAC Gerardo LVEA - Check in w/ Fil 18:49
17:55 VAC Travis LVEA - HAM3 feedthru work 19:15
18:02 VAC Betsy LVEA - HAM3 feedthru work 19:15
18:50 VAC Jordan X-arm BTE - Taking pictures 18:54
19:01 PEM Ryan C LVEA - BSC2 DM tests 19:41
19:26 CDS Marc, Patrick MER - Checking a chassis 19:36
19:31 SEI Jim, Randy LVEA - BSC2 HEPI spring replacement 20:25
20:11 CAL Tony Opt/PCal Labs Local Beam profiling Ongoing
20:31 FAC Randy LVEA - Craning table over X-arm 21:23
20:33 TCS TJ, Madi LVEA - TCSX table water lines 22:01
20:39 AOS Betsy, Anna LVEA - Walkabout 21:45
20:39 SUS Tom, Oli LVEA - QOSEM testing 21:54
20:57 SUS Fil LVEA - QOSEM testing 21:52
21:12 SAF Richard LVEA - Checks 21:30
21:13 CAL Dripta PCal Lab Local Beam profiling Ongoing
21:32 IAS Ryan C LVEA - Power cycling FARO 21:48
21:38 TCS Camilla LVEA - TCSX table water lines 21:57
21:58 SUS Oli CR - BS transfer functions 23:03
22:24 VAC Jordan, Gerardo LVEA - CP1 work 23:13
22:39 SUS Tom LVEA - QOSEM electronics Ongoing