Displaying report 1-1 of 1.
Reports until 07:45, Friday 01 May 2026
LHO General
ryan.short@LIGO.ORG - posted 07:45, Friday 01 May 2026 (90086)
Ops Day Shift Start

TITLE: 05/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.11 μm/s 
QUICK SUMMARY: Work continues to prep for the BBSS; likely a quieter day today.

Displaying report 1-1 of 1.