TITLE: 05/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Work continued with the BS on the test stand, preparations were made for HAM2 doors to come off later this week, and baffle installation in HAM3 all took place today.
I neglected to post this yesterday afternoon and unfortunately did not save the log.