Reports until 17:06, Monday 04 May 2026
H1 SUS (SUS)
ibrahim.abouelfettouh@LIGO.ORG - posted 17:06, Monday 04 May 2026 (90111)
BS/FM In-Vac Cables Replaced, Gold BS Baffles Removed, BBS Magnet Gluing Staged

Ibrahim, Betsy

Today we:

  1. Replaced the in-vac cables with the new QOSEM ones, maintaining their positions in the cable clamps
  2. Wrestled the gold BS baffles loose to make way for clearer alignment sighting
  3. Unpacked and set-up the magnet gluing set-up in prep for BBS01 arrival tomorrow.