LHO General
ryan.short@LIGO.ORG - posted 07:41, Tuesday 05 May 2026 (90120)
Ops Day Shift Start

TITLE: 05/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 14mph Gusts, 10mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.11 μm/s 
QUICK SUMMARY: Surveying on the BS at the test stand in the LVEA continues today, along with RGA work at HAM6 and CP1 regen near the Y-manifold. HAM2 doors are also likely to come off today.