LHO VE (VE)
jordan.vanosky@LIGO.ORG - posted 15:33, Tuesday 05 May 2026 (90128)
HAM6 RGA Maintenance

The HAM6 RGA tree had a known leak coming from the needle valve on the calibrated leak, so the calibrated leaks were removed from the system and the tree now only consists of the RGA, 10 l/s Ion Pump and a pump out port.

The tree was re-wrapped with heat tape and is currently baking at high temp using an aux cart and 80 l/s turbopump. Caution tape has been installed around the -Y door of HAM6, please avoid the area.

Images attached to this report