TITLE: 05/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Both doors are now off of HAM2 and the ISI is locked. The new BBS has also been delivered and is being prepped near the test stand. Baffle installation in HAM3 continueds today as well, and the TCSY table water lines started to be replaced.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:54 | VAC | Jordan | LVEA | - | Checking pumps (CP1) | 15:02 |
| 15:14 | FAC | Kim | LVEA | - | Technical cleaning | 16:45 |
| 15:33 | EE | Fil | MY | - | Picking up cables | 16:03 |
| 15:40 | FAC | Randy | LVEA | - | Prep for HAM2 door removal | 16:08 |
| 16:00 | SPI | Jeff | Opt Lab | - | Part spelunking | 16:08 |
| 16:02 | IAS | Jason, Stephen | LVEA | - | BS FARO surveying | 18:59 |
| 16:08 | VAC | Gerardo, Jordan, Randy | LVEA | - | HAM2 door removal | 18:43 |
| 16:09 | PEM | Robert | LVEA | - | HAM3 baffle installation | 19:13 |
| 16:16 | IAS | Ryan C | LVEA | - | BS FARO surveying | 18:59 |
| 16:19 | CAL | Tony, Dripta | PCal Lab | - | Prepping for measurement | 16:45 |
| 16:26 | PEM | Mitchell | LVEA | - | HAM3 baffle installation | 19:25 |
| 16:46 | CAL | Tony, Dripta | EX | YES | PCal measurement | 18:49 |
| 16:50 | FAC | Chris | LVEA | - | FAMIS checks | 17:23 |
| 17:01 | EE | Fil | MER | - | BHD electronics cabling | 18:39 |
| 17:24 | FAC | Chris | Ends, Mids | - | FAMIS checks | 18:37 |
| 17:25 | FAC | Kim | LVEA | - | Technical cleaning | 18:13 |
| 17:27 | VAC | Travis | LVEA | - | HAM2 door removal | 18:44 |
| 17:37 | SUS | Betsy, Ibrahim | LVEA | - | Many tasks (Betsy out @ 18:22) | 18:37 |
| 18:13 | FAC | Kim | FCES | - | Technical cleaning | 18:59 |
| 18:23 | SUS | Betsy | EX | - | Looking for ergo arm part | 19:06 |
| 18:43 | SEI | Jim | LVEA | - | Locking HAM2 ISI | 19:06 |
| 19:18 | FAC | Randy | LVEA | - | Craning in West bay | 20:03 |
| 20:14 | VAC | Jordan | LVEA | - | HAM6 RGA | 20:23 |
| 20:15 | FAC | Randy | LVEA | - | Moving scaffolding, BBS staging | 22:13 |
| 20:15 | SUS | Betsy | LVEA | - | BBS staging | Ongoing |
| 20:19 | IAS | Jason, Ryan C, Stephen | LVEA | - | BS FARO surveying | Ongoing |
| 20:33 | SUS | Ibrahim | LVEA | - | BBS staging | Ongoing |
| 20:36 | SAF | Richard | LVEA | - | Checks | 21:09 |
| 20:39 | CAL | Tony | PCal Lab | - | Checking part number | 21:30 |
| 20:52 | SEI | Jim | LVEA | - | HAM3 table masses | 22:37 |
| 20:59 | TCS | TJ, Camilla, Madi | LVEA | - | TCSY table water lines | 23:30 |
| 22:07 | SUS | Tom | LVEA | - | Delivering cables | 22:13 |
| 22:10 | VAC | Jordan | LVEA | - | HAM6 RGA | 22:18 |
| 22:47 | SLIC | Robert | LVEA | - | HAM3 baffle installation | Ongoing |
| 22:55 | VAC | Jordan, Gerardo | LVEA | - | Bringing pump to CP1 | 23:50 |