TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: Lots of work being done in the LVEA. Scaffolding was erected around GV7, the BBS is here and getting magnets bonded and cleaned, the IAS team is finishing final shots on the old BS, CP1 is still warm, SPI plate was put onto HAM2, and more!
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:51 | FAC | Kim | LVEA | n | Tech clean | 16:42 |
| 15:17 | FAC/VAC | Randy | LVEA | n | Prep for scaffold build around GV7 | 18:56 |
| 15:31 | FAC/VAC | Eric | LVEA | n | GV7 scaffold build | 18:56 |
| 15:38 | FAC/VAC | Chris | LVEA | n | GV7 scaffolding build | 18:56 |
| 15:59 | VAC | Jordan | LVEA | n | Check on CP1 and HAM6 RGA | 16:07 |
| 16:16 | ISC | Elenna | Opt lab | n | OMC BHSS work | 17:52 |
| 16:43 | SPI | Jeff | Opt Lab, LVEA | n | SPI ISIJ board install | 19:34 |
| 16:47 | PEM | Robert, Jim | LVEA | n | HAM2/3 chamber work and contamination checks | 19:27 |
| 17:01 | SUS | Oli | CR/LVEA | n | BS health check | 17:52 |
| 17:16 | FAC | Kim | LVEA | n | Tech clean | 17:54 |
| 17:16 | IAS/SUS | Betsy, Jason, Ryan C, Stephen, Rahul, Ibrahim | LVEA | n | IAS and SUS work (Betsy out @ 1910, Ibrahim/Rahul out 1930) | 20:44 |
| 17:25 | CDS | Erik | CER | n | CDS laptops | 17:29 |
| 18:43 | - | Richard | LVEA | n | Check in on crews | 18:45 |
| 19:59 | CDS | Fil, Jackie | MER, LVEA | n | MER cleanup, HAM6 rack work | 22:30 |
| 20:00 | VAC | Gerardo | LVEA | n | Check on CP1 | 20:45 |
| 20:09 | VAC | Jordan | LVEA | n | CS RGA work (HAM4 area +X) | 22:05 |
| 20:33 | SUS | Rahul, Ibrahim | LVEA | n | BBS bonding (Rahul out @ 23:26) | 00:07 |
| 20:37 | SUS | Betsy | LVEA | n | BBS and IAS check ins | 20:44 |
| 20:39 | FAC | Randy | LVEA | n | Cleanup around GV7 area | 21:46 |
| 20:53 | VAC | Gerardo | LVEA | n | Joining Jordan with the RGA | 22:05 |
| 21:02 | SUS | Betsy | LVEA | n | BBS work | 23:58 |
| 21:02 | CDS/SEI | Patrick | MER | n | Reimaging HEPI computer | 22:26 |
| 21:06 | - | Richard | LVEA | n | Check on crews | 21:46 |
| 21:23 | ISC | Elenna, Oli | Opt Lab | YES | BHSS OMC testing | 00:23 |
| 21:24 | TCS | Camilla | LVEA, Opt Lab | n | Clean up | 21:30 |
| 21:45 | IAS | Jason, Ryan C, Stephen | LVEA | n | BS alignment | 00:45 |
| 21:46 | SUS | Tom | LVEA | n | Check in with BBS crew | 21:53 |
| 22:00 | PEM | Robert | LVEA | n | HAM2/3 pictures and stray light | 23:18 |
| 22:10 | PEM | Tony | LVEA | n | HAM2/3 | 23:18 |
| 23:22 | PCAL | Tony | PCAL lab | n | Retrieving beam profiler | 00:22 |