Displaying report 1-1 of 1.
Reports until 16:33, Thursday 07 May 2026
H1 General
ryan.crouch@LIGO.ORG - posted 16:33, Thursday 07 May 2026 (90153)
OPS Thursday Day shift summary

TITLE: 05/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The LVEA is now is laser hazard, HAM2 ISS swap and HAM3 cabling was started today.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
13:55 FAC Kim LVEA N Tech clean 14:49
14:36 VAC Jordan LVEA N Check on CP1 and HAM6 RGA 15:25
15:37 FAC Kim LVEA YES Tech clean 17:12
15:50 FAC Ibrahim Optics lab N Grab mounts 16:37
16:11 EPO Mike, Mira LVEA N Tour the LVEA 16:55
16:23 CAL Tony PCAL lab N Grab equipment 16:38
16:24 SUS Rahul LVEA N Look for tool pan at HAM2 16:29
16:32 VAC Jordan LVEA YES Corner RGA work 18:35
16:35 FAC Eric Mezz N FAN1 work 18:15
16:36 ISS Keita, Elenna Optics Lab / LVEA n / YES ISS work 19:11
16:38 SQZ Sheila LVEA N SQZT7 work 16:42
16:42 SQZ Tony LVEA N Help Sheila, beam profiler 19:24
16:44 SQZ Sheila LVEA YES LazHaz transition then beam profiling 19:24
16:59 ISS Rahul, Jennie Opt Lab / LVEA n / YES ISS work 19:09
17:02 SQZ Ryan S LVEA YES Beam profiling 19:24
17:17 FAC Kim EX n Tech clean 18:02
18:02 FAC Kim EY n Tech clean 19:23
18:18 ContCont Robert LVEA YES BSC2 contamination control 20:37
18:32 EPO Anna + film crew LVEA YES Filming 20:07
18:35 ISS Jenne LVEA YES Locking JAC 19:06
19:09 EPO Ibrahim LVEA YES LVEA tour 19:49
19:43 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 04:03
19:49 SEI Jim EndY N Check out BRS-Y heater and wind fence 21:01
20:34 SUS Betsy, Ibrahim LVEA Y BBS cleaning cont. done at 22:25 22:56
20:38 VAC Jordan, Anna + film crew LVEA Y X1 beamtube  enclosure 21:13
20:46 ISC Rahul, Elenna, Madi, Disha, Keita LVEA Y ISS work HAM2, Disha Madi out @ 21:41, everyone except Keita 22:56 23:33
20:51 EE Fil LVEA Y Cables by HAM3 22:17
20:53 SAF Richard LVEA Y Check work by HAM2 21:04
21:12 SQZ Sheila, RyanS, Tony LVEA Y SQZT7 beam profiling, Tony Ryan out at 22:30 22:55
21:13 VAC Jordan LVEA Y RGA work by HAM6 22:45
21:22 ISC Jenne LVEA Y Join/assist HAM2 crew 21:49
21:31 ISC Jennie LVEA Y HAM3 work 22:30
22:25 ISC Jenne LVEA Y HAM3 work 23:30
22:43 SUS Betsy, Ibrahim LVEA Y ITM cover 23:43
22:51 OPS Corey CER Y Grab a vacuum 22:56
23:30 IAS Jason LVEA Y FARO auto power off/on 22:45
Displaying report 1-1 of 1.