TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
MC2 was fixed (cabling issue---see their alog). ISS team went out to HAM2 late this afternoon.
LOG:
- 1513-1542 LVEA garb checks (kim.dawn)
- 1528-1536 MC2 work fixes continue w/ work at racks (Rahul)
- 1549-1558 restoring mc2/pr2 cables (rahul)
- 1622-1628 reboot coil driver for mc2 (rahul.marc)
- 1655-1704 Dust monitor being power cycled, since it's been down (ryanC)
- 1645-1800 LVEA technical cleaning (kim)
- 1700-1830 Back to HAM3 for more checks (rahul.marc)
- 1703-1818 open light pipe, working on iot1, no locking for jac (jennie, madi)
- 1711-1945 BS/BBSS OSEM swaps (thomas.oli)
- 1745-2001 SQZT7 back panel off for table work (sheila)
- 1834-1852 Back to HAM3 area for another round of checks (rahul.marc)
- 1851-2000 Continuing JAC work at IOT7 & closed light pipe when out(madi.jennie)
- 1900-1947 EX grounding studies (robert)
- 2016-2110 Going into HAM3 for cable checks (rahul.marc)
- 2036-2300 FARO-ing ITMy @BSC1 (jasaon.ryanC.)
- 2054-2300 Stephen joining
- 2110 Fixed MC2! Mix up in the cable due to install and/or drawing (rahul, marc)
- 2125-2150 Woodland High School (Maggie)
- 2110 Continue ISS Array work at HAM2 (kieta,elenna,jennie)
- 2255 elenna out
- 2300 jennie out
- 2305 jenne in
- 2110-2300 Checking IOT1 JAC stuff (jennie)
- 2234-2305 PCal checks at EX (marc)
- 2250 Marc plugged in cables and we have data for channels he was looking at
- 2239 EX grounding checks (robert)
- 2245 Checking on ISS work (rahul)
- 2315-2323 TCS chiller famis check (corey)
- 2327 Grabbing headsets for ISS array group (oli)