H1 AOS (SYS)
jason.oberling@LIGO.ORG - posted 09:43, Friday 08 May 2026 - last comment - 10:55, Friday 08 May 2026(90170)
aLIGO BS Test Stand Surveying Complete (WP 13210)

R. Crouch, J. Oberling, B. Weaver, S. Appert

We are done with the surveying of the aLIGO BS on the mechanical test stand.  I'm still working on processing the data but can give a quick overview of where things stand:

I'm working on a larger alog tying together all of our BS and WBSC2 measurements (WBSC2 support tube ends, BS in-chamber, and BS on the test stand) to provide a more complete picture of the BS alignment as we have measured it these last couple of weeks (it's going to be a long one); this alog will have the full set of data from the various test stand measurements.  In addition, the SUS and IAS teams met yesterday to discuss our path forward.  We decided that, despite the error seen in pointing on the test stand, we will align the BBS to its nominal position and pointing w.r.t. the ISI on the test stand.  Once back in-chamber we will use the BBS SUS cage position as the metric for adjusting HEPI to once again place the BBS in its nominal in-chamber position; pointing will be restored with the BS optical lever, as originally planned.  I'll write up a RODA documenting this decision and upload it to the DCC ASAP.

This completes LHO WP 13210.

Edit: Some spelling and grammar clean up.

Comments related to this report
ryan.crouch@LIGO.ORG - 10:55, Friday 08 May 2026 (90174)EPO

Adding some photos I took throughout the test stand measurements Tagging EPO.

Images attached to this comment