Reports until 16:30, Tuesday 12 May 2026
LHO General (OpsInfo)
thomas.shaffer@LIGO.ORG - posted 16:30, Tuesday 12 May 2026 (90209)
Ops Day Shift End

TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The BS suspension was removed from the ISI that it hung from today. The LVEA continues to be in laser hazard for the ISS swap work, which will continue on for another day or so. Alignment trends attached, no surprises with the ongoing ISS work.

Operators - It looks like the LVEA temperature has been trending up over the last week (see screenshot). We should keep an eye on this to verify that it comes back.


LOG:                                                                                                                                                     

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 12:03
15:14 FAC Kim LVEA yes Tech clean 17:05
15:17 IAS Ryan C LVEA yes Warm up Faro 15:33
15:20 FAC Randy LVEA yes Setting up lights at test stand 15:58
16:05 FAC Randy LVEA yes Prep and setup 16:36
16:20 SUS Betsy, Rahul LVEA yes BBS bonding and sus prep 18:46
16:27 SAF Keita LVEA YES Opening light pipe 16:44
16:31 FAC Chris MY n Bringing battery charger 17:31
17:01 SUS Ibrahim LVEA yes BBS work 18:56
17:03 SUS Randy LVEA yes Assist with BBS 18:38
17:17 PEM Robert EX n Magnetic coupling investigation 19:31
17:31 SEI Jim, Michael, Shoshana LVEA yes Moving CRS into the H2 PSL enclosure 19:03
17:34 IAS Jason, Ryan C, Stephen LVEA yes Monument search and error hunt 19:56
17:54 FAC Kim LVEA yes Tech clean 18:48
19:32 SPI Jeff Opt Lab n SPI assembly 21:56
19:33 SUS Ibrahim LVEA yes BBS work 22:03
19:43 SUS Randy LVEA yes BBS work 22:03
19:46 SUS Betsy LVEA yes BBS work 22:03
19:57 CDS Marc, Josh LVEA yes SUS R2 rack testing out SPI electronics 21:42
20:27 SUS Rahul LVEA yes BBS work 20:35
20:28 SUS Travis LVEA yes Bringing out hardware 20:33
20:50 FAC Tyler LVEA yes Inspect scaffolding 21:05
21:02 NCAL Tony, Michael, Shoshana EX n Spin up NCAL 22:13
21:05 SEI Mitchell ends n HEPI FAMIS checks 21:46
21:22 PEM Robert EX n Magnetic coupling invesitgation cont. 23:23
22:28 SEI Jim, Michael, Shoshana LVEA y H2  anteroom CRS build (M & S out @2300) 23:07
Images attached to this report