Ibrahim, Betsy, Oli
BBS01 AOSEM flag standoffs were removed, concluding gluing.
BBS01 was flipped to the HR Side via the inspection fixture.
Betsy and I then first contacted the HR Side (S1) and peeled an hour or so later.
We did not see any features or defects as we did with S2.