Ibrahim, Betsy, Randy
Today, we:
- Took the BBSS out of the can after securing the BSFM.
- Prepped the BBSS
- blew the suspension with nitrogen top gun from top down
- took the lifting plates out and set it down on its assembly tooling
- attached the 45 degree lifting arms
- Prepped the ERGO arm
- 2 adjustment O-rings had to be re-installed
- BBS plate was used to lift practice glass
- Dry run of where it would go with the optic was done
- Prepped the Aluma-Lift
- cleaned the lift arms
- positioned and dry-ran the path it would take during install
Particle counts were checked periodically and were under 75 consistently during acitvity
See pictures.