TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY:
New ISS Array alignment will continue as well as work with the new Bigger BeamSplitter.
No alarms overnight. Clearer & calmer weather this morning.
With the better weather, perhaps the DGR subcontractors will start pouring concrete for the CEBEX walls today (this will require the main gate to be left open for the cement trucks to roll through. (WP# 13250)