Displaying report 1-1 of 1.
Reports until 15:20, Thursday 14 May 2026
H1 SUS
ibrahim.abouelfettouh@LIGO.ORG - posted 15:20, Thursday 14 May 2026 (90249)
BBS01 Installed into BBSS

Ibrahim, Betsy, Oli

Today, we installed BBS01 into the BBSS successfully. 

BBS01 was on a table. BBSS was on the aluma lift. We picked BBS01 using the ERGO arm and slowly came into the optic. In this process, we:

On top of pictures below, 2 videos:

Images attached to this report
Displaying report 1-1 of 1.