Displaying report 1-1 of 1.
Reports until 07:38, Monday 18 May 2026
LHO General
ryan.short@LIGO.ORG - posted 07:38, Monday 18 May 2026 (90260)
Ops Day Shift Start

TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 12mph Gusts, 6mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.15 μm/s 
QUICK SUMMARY: No alarms over the weekend, temperatures looking normal, dust counts low as well. The same 31 channels are disconnected from the EDC since the CS HEPI pump controller is still down.

Likely continuing with alignment work in HAM2 today following the ISS array replacement.

Displaying report 1-1 of 1.