TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Alignment work continued in HAM2 today, along with more prep of the BBSS and IAS surveying on the test stand. Since SPI alignment is ongoing on the optics lab, the laser remains on and running unattended with appropriate barriers and signage up.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | Ongoing |
| 14:50 | FAC | Kim | LVEA | - | Technical cleaning | 16:09 |
| 15:19 | VAC | Jordan | LVEA | - | Pump checks | 15:26 |
| 15:55 | FAC | Randy, Jeff | LVEA | - | Moving IOT2L a little | 16:16 |
| 15:55 | SPI | Jeff | Opt Lab | Local | SPI prep | 18:28 |
| 16:29 | IAS | Jason, Ryan C | LVEA | - | BS FARO surveying | 19:55 |
| 16:30 | ISC | Keita | LVEA | - | Opening lightpipe | 16:44 |
| 16:46 | SUS | Betsy, Ibrahim | LVEA | - | BBSS work | 18:34 |
| 16:52 | TCS | TJ | LVEA | - | Checking on TCSY water lines | 17:10 |
| 17:09 | SUS | Randy | LVEA | - | BBSS work | 20:09 |
| 17:18 | SPI | Josh | LVEA | - | SPI work at SUS-R2 | 18:32 |
| 18:04 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 18:28 |
| 19:26 | SPI | Jeff | Opt Lab | Local | SPI alignment | 21:53 |
| 19:37 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 19:47 |
| 20:10 | SEI | Fil | MER | n | HEPI electronics work | Ongoing |
| 20:10 | SPI | Josh | LVEA | - | SPI work at SUS-R2 | Ongoing |
| 20:11 | SUS | Betsy, Ibrahim | LVEA | - | BBSS work | Ongoing |
| 20:28 | SUS | Randy | LVEA | - | BBSS work | 21:38 |
| 21:06 | IAS | Jason, Ryan C | LVEA | - | BS FARO surveying | Ongoing |
| 22:24 | ISC | Keita | Opt Lab | - | Looking for parts | 23:02 |
| 22:44 | ISC | Rahul | Opt Lab | - | Looking for parts | 23:02 |
| 23:03 | ISC | Keita, Rahul | LVEA | Y | HAM2 beam alignment | Ongoing |