TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 1mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY: No alarms overnight, temperatures and dust counts looking normal. More alignment work in HAM2 planned for today along with continued prep on the BBSS in the LVEA west bay. CR workstations and wall FOMs are finishing their restarts.