TITLE: 05/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Lots of good work done today. Jason and crew made IAS progress over on the Beam Splitter.
Oli and Ibrahim have been working with the B-OSEMS over at the new BS too..
Vac team did some RGA baking and pump carting as per usual.
The SEI crew cleaned some CRS optics and worked on HAM3 feed throughs.
X are has been de-tumbleweeded with the big Green Machine.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:30 | FAC | Randy | LVEA | n | Weighing BBSS coffin (started 14:10) | 14:31 |
| 14:57 | FAC | Kim | LVEA | n | Tech clean | 16:25 |
| 15:11 | PCAL | Tony | PCAL Lab | y(local) | Taking apeture caps off | 15:13 |
| 16:06 | IAS | Jason RyanC | LVEA West Bae | N | Big Beam Splitter work Ryan out early | 20:06 |
| 16:07 | EE | Fil | Mech Room | N | Working on HEPI system | 23:58 |
| 16:08 | FAC | Kim | LVEA | n | Technical cleaning | 16:08 |
| 16:21 | SUS | Oli & Ibrahim | LVEA West Bay | N | Aligning B-OSEMs and other SUS work | 20:22 |
| 16:23 | SPI | Jeff | Optics Lab | YES | SPI work in Laser Hazard. | 20:58 |
| 16:24 | FAC | Kim | Optics Lab | y | empting red bins. | 16:32 |
| 16:32 | VAC | Jordan | LVEA | N | Walk around the LVEA and check pumps and RGAs | 16:37 |
| 16:55 | SUS | Elenna | LVEA West | N | Giving parts to SUS folk | 17:01 |
| 17:10 | FAC | Kim | LVEA | N | Technical Cleaning. | 17:35 |
| 17:24 | FAC | Randy | X arm | N | Tumbleweeding with Big Green. | 21:06 |
| 17:41 | FAC | Kim | EY | N | Technical Cleaning | 18:51 |
| 17:52 | SEI | Travis | LVEA HAM3 | N | Working on Feedthroughs | 18:30 |
| 18:06 | SEI | Ryan S & Shoshanna | LVEA | N | Cleaning CRS optics | 19:50 |
| 18:15 | SEI | Jim | LVEA HAM3 | N | Working on feed throughs | 19:49 |
| 18:51 | SPI | Josh | LVEA HAM3 | N | SPI work near HAM3 | 20:12 |
| 20:05 | TCS | TJ & Madi | LVEA Both TCS tables | N | making sure the TCS table alignment it still good. | 20:52 |
| 20:28 | VAC | Jordan | HAM6 | N | Shutting down RGA Bake | 20:32 |
| 20:47 | SEI | Jim, Shoshanna, RyanS | Optics Lab | n | Cleaning optics | 23:47 |
| 21:01 | VAC | Travis | LVEA | n | Parts hunting | 21:29 |
| 21:01 | VAC | Jordan | Prep lab | n | Parts | 21:09 |
| 21:42 | VAC | Travis, jordan | LVEA | n | CP1 pump check | 22:02 |
| 22:08 | SUS | Oli, Madi | LVEA | n | BBS work | 00:08 |
| 22:22 | PCAL | Tony | PCAL lab | yes | Starting TSA measurement | 22:31 |
| 22:43 | VAC | Jordan | LVEA | N | Looking at scaffolding | 22:49 |
| 23:05 | VAC | Travis | LVEA | N | Checkin pump cart | 23:10 |