Thursday Ops Report

TITLE: 05/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

20:44 UTC the TSCX chiller's flow went to zero. 
TJ turned the chillers back on and walked the lines to check for leaks.
Pressure and flow seems to be stable now.


VAC Alarms: Type Error while running test: VAC
GV1 is OPEN
GV5 is closed.
GV6 is closed.
Type Error cleared in VAC.  I guess this is was caused by the CDS team. 


DAQ restart happening at 22:28 UTC.  Dave Says we are the DAQ restarts are done.

LOG:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
14:54 VAC Jordan LVEA N Turning off the purge air. 15:03
14:56 VAC Jordan & Contractor Kobelco Pumps N working on VAC pumps. 19:56
14:57 NATR Snake LVEA Near PSL N Sneakin around looking for the mouse. 16:27
14:58 NATR Mouse LVEA Y-arm N Stuck in trap. 16:27
15:16 Safety Richard LVEA N Looking for wildlife. 15:36
15:25 VAC Jordan LVEA N Looking for wildlife. 15:45
15:26 NATR Eric LVEA N Looking for wildlife 16:03
16:11 EE Fil Mech Room n Working on HEPI 18:11
16:38 SEI Jim, Ryan S, Shoshanna Optics lab N cleaning optics 17:36
16:42 FAC Kim LVEA N Technical cleaning & resupply. 17:07
16:44 IAS Jason LVEA N Faro work on BBSS pitch and Yaw. 19:08
17:05 CDS Patrick Mech room N Searching for Fil 17:14
17:08 FAC Randy LVEA near BSC2 n taking measurements, NOT inside chamber. 18:25
17:08 FAC Kim EX N Technical cleaning & resupply 19:08
17:15 Safety Main Gate Main Gate N Main Gate is locked OPEN 23:11
17:17 BBSS Betsy LVEA N Driving the BBSS 18:45
17:21 TCS Camilla & Madie EY Yes Working with the ALS table 18:03
17:22 VAC Travis LVEA N Helping Besty with BBSS 18:11
17:29 BSC2 TJ LVEA BSC2 N Helping Randy with measurments 17:52
18:17 VAC Gerardo LVEA N Shutting off the Purge air valve In the LVEA 18:45
19:06 FAC Randy LVEA N BSC2 platform measurements. 20:59
19:57 BBSS Betsy LVEA N swapping osems. 22:57
20:04 SEI Ryan & Shoshanna LVEA H2 PSL N Building LLO CSRs 23:03
20:15 BBSS Oli LVEA N Helping Betsy 00:13
20:39 IAS Jason LVEA West bea N BBSS pitch and yaw measurements. 23:38
20:54 TSC Camilla & Mitchel Optics Lab N getting part? 22:11
20:58 CDS Patrick MER N talking with Fil 21:02
21:03 VAC Fil & Jordan MER N Workin on HEPI 23:03
21:13 TCS TJ LVEA N Checking on TCSX chiller flow rate. 21:41
21:27 EE Fil LVEA N Helping Betsy and Oli 22:37
21:29 FAC Randy LVEA Test stand N Taking more measurements. 22:00
21:42 SUS Rahul LVEA N Bag and Tag parts. 22:22
22:22 VAC Travis LVEA N Checking vac guages for glitches from the power fluxuation. 22:26
22:40 CDS Dave CUR N DAQ restarts to add new channels 22:40
22:41 CDS Fil & Patrick MER N Working on HEPI Beckhoff (Patrick \ 00:25
22:51 ALS Madie  Camilla EY YES Measuring ALS beam 23:51