TITLE: 05/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 7mph Gusts, 4mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.14 μm/s
QUICK SUMMARY:
Sounds like there is some work on gate valve 7 happening today. Gate valve 8 will also be shut which will be loud.
More BBSS work is very likely.
Purge Air is back on.